2020 april 28th. The basement wall mould will be partially filled with concrete today ;-)
2020 april 28th. The basement wall mould is partially filled with concrete today ;-)
2020 april 28th. The basement wall mould is partially filled with concrete today. The guys holding the flexible pipe are actually using a vibrator to get rid of air pockets in the fresh concrete ;-)
2020 april 28th. The concrete mixer truck is continuously feeding the concrete pump truck ;-)
2020 april 28th. Typical modern building machines used in Presika ;-)
2020 april 27th. Almost forgot the snapshot of the obligatory builder's information board ;-(
2020 april 25th. The base platform is ready and next step is to raise the walls ;-)
2020 april 24th. Today is the C day. Concrete filling of the mould at Presika ;-)
2020 april 24th. The poor neighbour at Brseč 51 has to endure continuous noise and dust from the new building site ;-)
2020 april 23rd. The mould is ready including reinforcement, pipes etc. Now we are eagerly waiting for the concrete truck ;-)
2020 april 22nd. The bottom sewer pipes are positioned on the reinforcement net. Denis and Nevio checks that the garage floor level will be OK ;-)
2020 april 21st. The guys are preparing the mold for the reinforced-concrete house foundation ;-)
2020 april 9th. The M&K building project in Presika. The basement area is now cleaned and ready for next step ;-)
2020 april 9th. The M&K building project in Presika
2020 april 7th. Barbara and Mario ask the excavator driver to drop a loadful of soil in the garden ;-)
2020 april 7th. Barbara and Mario check that the excavator driver drop the loadful of soil in the right place ;-)
2020 april 7th. Barbara chats with the excavator driver in Prersika ;-)
2020 april 7th. The excavator driver did a good job today at Presika ;-)
2020 april 5th. M&K's house building project started today by giving the excavator access to the building plot ;-)
2020 april 5th. The excavator levels the spot for M&K's house position ;-)